Princes House

We undertook a combination of works to three different areas within this Crown estate building.

Level 4 – Unit 4C

  • Adaptations to existing underfloor 4 pipe fan coil system, to suit the new CAT A + layout.

  • Installation of a new Comms cooling AC unit

  • BMS network adaptions and upgrades

  • New extract ventilation to tea point area

  • Ductwork cleaning and air monitoring reports

  • Witness test and commission and handover to the client

Level 2 – Unit 2A

  • Full HVAC validation incl. water sample analysis and microbiology reports.

  • Adaptations to existing underfloor 4 pipe fan coil system, to suit the new CAT A + layout.

  • BMS network adaptions and upgrades

  • Ductwork cleaning and air monitoring reports

  • Witness test and commission and handover to the client

  • New extract ventilation to tea point area

 
 

Mezz Level:

  • Full HVAC calculations and design

  • Full strip out and removal of existing 4 pipe fan coil system and associated network cabling

  • Supply and install all new Diffusion 4 pipe fan coil system complete with all new secondary pipework

  • All new commissioning valve sets and actuators

  • Adaptions to primary and secondary ventilation ductwork

  • All new pipework insulation

  • All new BMS cabling network installed and commissioned

  • Ductwork cleaning and air monitoring reports

  • Witness test and commission and handover to the client

  • New extract ventilation to tea point area